EST. 1990 // 36 YEARS ENTERPRISE INFRASTRUCTURE ENGINEERING • CENTRAL FLORIDA ONSITE & NATIONWIDE REMOTE
DIRECT DISPATCH: (407) 917-5250
INTERACTIVE SYSTEM SIZERS // CLIENT-SIDE RUNTIME STD-2026-ENG-CALC-01

Interactive Infrastructure Sizers & Security Audit.

Architectural planning tools developed by Steve Cormier based on 36 years of enterprise virtualization, carrier telephony engineering, and CIS Level 2 hardening. Compute hardware footprints, voice bandwidth quotas, and organizational security postures instantly in real time.

CALCULATOR 01 // HYPERVISOR CLUSTER & COMPUTE SIZER
VMware ESXi 8.0 • Windows Hyper-V
Workload Virtual Machines (VMs) 25 VMs
5 VMs (Branch) 100 VMs (Mid-Market) 250 VMs (Enterprise)
Avg vCPU per VM 2 vCPUs
1 vCPU 4 vCPUs 8 vCPUs
Avg RAM per VM 16 GB
4 GB 32 GB 64 GB
Raw Storage Need 10 TB
2 TB 50 TB 100 TB
Cluster Hardware Architecture • SIZED
Recommended Physical Hosts: 3 Physical Nodes Dell PowerEdge R760 or HPE ProLiant DL380 Gen11
Per-Host Sockets/Cores: 2x 16-Core Xeon
Per-Host ECC RAM: 256 GB DDR5
SAN / Storage Topology: All-Flash NVMe iSCSI SAN (24 TB Raw) RAID-10 + 20% Snapshot / VM Swap Reserve
vSwitch Network Fabric: Dual 25GbE SFP28 with vDS LACP Isolated vMotion, iSCSI SAN, and Management VLANs
CALCULATOR 02 // VOIP & IP-PBX SIP TRUNK SIZER
Session Border Controllers • Carrier Trunks
Total Handsets / Softphone Extensions 40 Phones
5 Extensions 150 Extensions 500 Extensions
Peak Concurrent Calls % 25% (Standard)
10% Low 25% Standard 60% Call Center
Telephony Trunk Specifications • CALCULATED
Required SIP Trunk Channels: 10 Concurrent Paths Carrier DID rollover with sub-second trunk failover
QoS Voice Bandwidth: 1.05 Mbps DSCP EF (46)
PoE Switch Budget: 616 Watts 802.3af Class 2
Session Border Controller: Enterprise Edge SBC (TLS / SRTP Enabled) Hardware-assisted NAT traversal & Teams Direct Routing
CALCULATOR 03 // 60-SECOND HARDENING & AI READINESS AUDIT
Zero-Trust • M365 Copilot • CIS Level 2
Toggle your organization's active controls:
Posture Telemetry BASE AUDIT
Architecture Posture Score
50 / 100
MODERATE RISK • REMEDIATION RECOMMENDED
Priority Remediation Items:
  • • Audit SharePoint permissions before enabling M365 Copilot
  • • Implement East-West VLAN firewall boundaries
  • • Deploy Microsoft Intune MDM compliance baselines
Pre-populates dispatch intake form with your score & gap analysis